{"id":928,"date":"2022-12-14T22:07:58","date_gmt":"2022-12-14T22:07:58","guid":{"rendered":"https:\/\/basketball.runfyers.com\/index.php\/2022\/12\/14\/new-pbot-program-will-leverage-paving-projects-to-redesign-streets-bikeportland\/"},"modified":"2022-12-14T22:07:58","modified_gmt":"2022-12-14T22:07:58","slug":"new-pbot-program-will-leverage-paving-projects-to-redesign-streets-bikeportland","status":"publish","type":"post","link":"https:\/\/basketball.runfyers.com\/index.php\/2022\/12\/14\/new-pbot-program-will-leverage-paving-projects-to-redesign-streets-bikeportland\/","title":{"rendered":"New PBOT program will leverage paving projects to redesign streets \u2013 BikePortland"},"content":{"rendered":"<p><\/p>\n<div itemprop=\"text\">\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-1.15.26-PM.jpg\" target=\"_blank\" rel=\"noopener\"><\/a><figcaption>A 2017 paving project on SW Main was a precursor to what might become an influential new program at PBOT. (Photo: Jonathan Maus\/BikePortland)<\/figcaption><\/figure>\n<\/div>\n<figure class=\"wp-block-pullquote alignright has-text-align-right has-small-font-size\">\n<blockquote>\n<p>\u201cIn the old days, paving projects were just paving projects and it was very hard to do any of these enhancements.\u201d<\/p>\n<p><cite>\u2013 Zef Wagner, PBOT<\/cite><\/p><\/blockquote>\n<\/figure>\n<p>A significant evolution in how the Portland Bureau of Transportation operates could have a major impact on bicycling.<\/p>\n<p>At Tuesday night\u2019s Bicycle Advisory Committee meeting, PBOT Planner Zef Wagner shared an early look at a fledgling new program within the agency that could dramatically boost the quality of our transportation network with bike lanes on major commercial streets and neighborhood collectors. They\u2019re calling it the \u201cpaving leverage program\u201d and it would institutionalize what has so far been an ad hoc approach by opportunistic, forward-thinking staff.<\/p>\n<p>Some of the projects on PBOT\u2019s radar are game-changers and could bring protected bike lanes to streets including: inner NE Broadway, NE Sandy Blvd, N Interstate, SE Milwaukie, and many others.<\/p>\n<p>The idea is to work closely with PBOT\u2019s <a href=\"https:\/\/www.portland.gov\/transportation\/maintenance\" target=\"_blank\" rel=\"noopener\">Maintenance Operation<\/a>s (MO) division to do lane reconfigurations, striping changes, and street design updates as part of repaving projects. BikePortland readers are familiar with this concept because you\u2019ve read about it happening several times in recent years on projects like <a href=\"https:\/\/bikeportland.org\/2017\/12\/20\/a-closer-look-at-pbots-sw-1st-and-main-project-261946\" target=\"_blank\" rel=\"noopener\">SE Main<\/a>, <a href=\"https:\/\/bikeportland.org\/2021\/11\/30\/the-contentious-hawthorne-pave-and-paint-project-is-complete-341672\" target=\"_blank\" rel=\"noopener\">SE Hawthorne,<\/a> and most recently (as in, <a href=\"https:\/\/bikeportland.org\/2022\/12\/13\/neighbors-support-less-parking-new-bike-lane-design-on-ne-killingsworth-368249\" target=\"_blank\" rel=\"noopener\">yesterday<\/a>) NE Killingsworth. In each of those examples, PBOT leveraged a planned paving project to take a broader look and consider whether bike lane (and related) updates could be added. When MO crews grind off the top layer of a street for a paving project, they have no obligation to replace it with the same lane striping as before.<\/p>\n<p>It\u2019s as simple as taking advantage of a clean slate to create a street that more closely aligns with PBOT\u2019s goals and vision. Now PBOT wants to make that approach standard operating procedure.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.28.17-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"886\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.28.17-AM-1200x886.jpg\" alt=\"\" class=\"wp-image-368347\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.28.17-AM-1200x886.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.28.17-AM-320x236.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.28.17-AM-1536x1134.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.28.17-AM-2048x1512.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><figcaption>Map shown by PBOT last night.<\/figcaption><\/figure>\n<\/div>\n<p>\u201cIn the old days, paving projects were just paving projects and it was very hard to do any of these enhancements,\u201d Wagner said at the meeting last night. \u201cBut now we\u2019re working much closer with our pavement crews and planning these things together. And they\u2019re being they\u2019ve been very gracious and sort of entertaining our wild ideas for street redesigns.\u201d Wagner said in the past, MO would only release their street paving project list one year in advance, which didn\u2019t give PBOT planners time to assess the feasibility of changes. Now, for the first time ever, the MO Division has released a five-year list of paving projects. \u201cNow we can really plan ahead and take the time we need,\u201d Wagner said.<\/p>\n<p>On that note, Wagner asked BAC members at the meeting to share feedback on which specific projects PBOT should pursue (see the list below). Wagner highlighted several projects he feels are especially promising candidates for major bike lane upgrades (the projects could also come with non-bike stuff like transit upgrades, street trees, crossing enhancements, and so on).<\/p>\n<p>As you look through the projects, keep in mind that PBOT approaches them with an understanding that the ultimate scope of the changes is limited by funding and staff capacity. \u201cWe need to work within the limits of the paving project and timeline\u2026 we\u2019re not going to do a bunch of moving curbs, raised cycle tracks, you know all these kinds of like things that are larger capital projects,\u201d Wagner cautioned. In his view, the idea is to claim the space for the bikeway now, and seek more funding to upgrade it in the future.<\/p>\n<p>The projects below (listed by year of construction with graphics from <a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/bac_paving-leverage-opportunities.pdf\" target=\"_blank\" rel=\"noopener\">PBOT\u2019s presentation<\/a>) are the ones Wagner said PBOT staff have already identified as \u201creally good and clear opportunities\u201d:<\/p>\n<h2>2023<\/h2>\n<p>The projects below are already design and planned. There\u2019s no ability to influence them, so Wagner didn\u2019t share any concept designs.<\/p>\n<p><strong>NE 33rd from NE Brazee to NE Liberty: <\/strong>This project will include <a href=\"https:\/\/bikeportland.org\/2022\/07\/29\/city-plans-two-way-protected-bike-lane-on-ne-33rd-and-skidmore-360601\" target=\"_blank\" rel=\"noopener\">an offset bike crossing at Mason and Skidmore<\/a> and buffered bike lanes north of Holman! This is great news because NE 33rd is a key connection to the popular Marine Drive bike path and this short gap between Holman and Lombard was always the most sketchy part of the ride.<\/p>\n<p><strong>NW St Helens Rd from Lakeview to Yeon: <\/strong> PBOT plans to narrow existing general purpose lanes and add buffers to widen the bike lanes.<\/p>\n<p><strong>NE Alderwood Rd from 82nd to 105th: <\/strong>PBOT plans to narrow existing general purpose lanes and add buffers to widen the bike lanes.<\/p>\n<p><strong>SE Stark St from 86th to 117th and SE Washington St from 82nd to Stark:<\/strong> PBOT plans to add and improve bike lanes on both streets through Montavilla and Gateway<\/p>\n<h2><strong>2024<\/strong><\/h2>\n<p>The projects below are set for paving in 2024. Wagner said there\u2019s still time to influence their design but we\u2019ll have to move relatively fast in terms of design debates and public process.<\/p>\n<p class=\"has-text-align-left\"><strong>NE Broadway from 11th to 24th Avenue<\/strong><\/p>\n<figure class=\"wp-container-2 wp-block-gallery-1 wp-block-gallery has-nested-images columns-default is-cropped\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"2258\" height=\"614\" data-id=\"368348\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM.jpg\" alt=\"\" class=\"wp-image-368348\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM.jpg 2258w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM-320x87.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM-1200x326.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM-1536x418.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.35.46-AM-2048x557.jpg 2048w\" sizes=\"(max-width: 2258px) 100vw, 2258px\"\/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.06-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1642\" height=\"696\" data-id=\"368349\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.06-AM.jpg\" alt=\"\" class=\"wp-image-368349\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.06-AM.jpg 1642w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.06-AM-320x136.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.06-AM-1200x509.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.06-AM-1536x651.jpg 1536w\" sizes=\"(max-width: 1642px) 100vw, 1642px\"\/><\/a><\/figure><figcaption class=\"blocks-gallery-caption\">Two design options for NE Broadway (click to view)<\/figcaption><\/figure>\n<p>This would be an amazing addition to the bike network, especially if we can get protected bike lanes all the way to existing ones on NE 7th and eventually tie it into the changes coming as part of the I-5 Rose Quarter. Wagner said there\u2019s enough room to do a wider, parking-protected bike lane just by narrowing the existing general purpose lanes. \u201cThat would be the least impactful to the neighborhood and traffic,\u201d he said. But keeping all three lanes for drivers would mean it stays unsafe. One option he shared would be to create a diagonal parking lane on the south side. \u201cThis would help mitigate the loss of a lot of parking on the north side\u2026 And so this might be an option that the business community could get behind even though it\u2019s removing a travel lane\u2026 Diagonal parking can also have a traffic calming effect because you have to drive pretty carefully next to it.\u201d<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p class=\"has-text-align-left\"><strong>NE Weidler St: 15th to 20th<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.19-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"384\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.19-AM-1200x384.jpg\" alt=\"\" class=\"wp-image-368350\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.19-AM-1200x384.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.19-AM-320x102.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.19-AM-1536x491.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.19-AM-2048x655.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>PBOT could narrow travel lanes to buffer and widen the existing bike lane. Adding physical protection like curbs or flex posts could happen, but more funding would be needed.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>SE 52nd Ave: Flavel St to Duke St<\/strong><\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.27-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"384\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.27-AM-1200x384.jpg\" alt=\"\" class=\"wp-image-368351\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.27-AM-1200x384.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.27-AM-320x102.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.27-AM-1536x491.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.27-AM-2048x655.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<p>There\u2019s an opportunity at this location to remove parking on one side and widen existing bike lanes. One option would be to have the parking protected bike lane on one side and just a protected bike lane on the other side, which would require removing parking on one side of the street.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>NE Halsey St: 119th Ave to 132nd Ave<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.55-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"376\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.55-AM-1200x376.jpg\" alt=\"\" class=\"wp-image-368352\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.55-AM-1200x376.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.55-AM-320x100.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.55-AM-1536x481.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.36.55-AM-2048x642.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>PBOT has already recommended removing on-street parking and widening the existing bike lanes here in their East Portland Arterial Streets Strategy (EPASS) plan.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>NE 122nd Ave: Glisan St to Broadway <\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.37.52-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"357\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.37.52-AM-1200x357.jpg\" alt=\"\" class=\"wp-image-368353\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.37.52-AM-1200x357.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.37.52-AM-320x95.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.37.52-AM-1536x456.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.37.52-AM-2048x609.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>Wagner said they recommended removing on-street parking in this section because it\u2019s not well-used. That would give them space for wide buffered bike lanes, or something more protected if they could find additional funding.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<h2>2025<\/h2>\n<p>Projects slated for 2025 give PBOT even more time to do analysis and find funding to make sure the street is replaced with a much better design.<\/p>\n<p><strong>SE 11th Ave: Caruthers St to Mill St<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.21-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"368\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.21-AM-1200x368.jpg\" alt=\"\" class=\"wp-image-368354\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.21-AM-1200x368.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.21-AM-320x98.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.21-AM-1536x471.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.21-AM-2048x628.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>Already called for in the Central City in Motion Plan, PBOT would repurpose an existing lane for a buffered bike lane. Design would feel similar to N Williams or N Vancouver (parking-protected bike lane not possible here due to emergency response needs).<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>NE Glisan St: 84th Ave to I-205<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.56-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"393\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.56-AM-1200x393.jpg\" alt=\"\" class=\"wp-image-368355\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.56-AM-1200x393.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.56-AM-320x105.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.56-AM-1536x503.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.38.56-AM-2048x670.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>PBOT would repurpose existing lanes to create protected bike lanes from the 80s bikeway to the I-205 path and eventually existing bikeways on 102nd Ave.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>N Interstate Ave: Killingsworth St to Dekum St<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.39.20-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"368\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.39.20-AM-1200x368.jpg\" alt=\"\" class=\"wp-image-368356\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.39.20-AM-1200x368.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.39.20-AM-320x98.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.39.20-AM-1536x471.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.39.20-AM-2048x628.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>Wagner called this an opportunity to swap on-street parking in order to \u201cfill a critical bikeway network gap.\u201d Planning has already begun for this project through the North Portland in Motion Plan. Due to existing curb extensions, left-turn lanes, and MAX platforms, the bike lane would get squeezed at intersection. That\u2019s just one reason this would be a tricky project. \u201cIt requires a lot of parking removal in an area that\u2019s seeing a lot more housing growth and so we know that this one will get a lot of concerns from the surrounding community,\u201d Wagner said.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>N Portsmouth Ave: Lombard St to Willamette Blvd<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.11-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"413\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.11-AM-1200x413.jpg\" alt=\"\" class=\"wp-image-368357\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.11-AM-1200x413.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.11-AM-320x110.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.11-AM-1536x529.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.11-AM-2048x705.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>PBOT would swap on-street parking on one side of the street for a parking protected bike lane, which would also create space for more median islands to make crossings safer.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>N Willamette Blvd: Carey Blvd to Portsmouth Ave<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.49-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"413\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.49-AM-1200x413.jpg\" alt=\"\" class=\"wp-image-368358\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.49-AM-1200x413.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.49-AM-320x110.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.49-AM-1536x529.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.40.49-AM-2048x705.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>PBOT sees this paving project as an opportunity to get a jump on the federally funded Willamette Active Transportation Corridor which is slated for 2026. The idea is to install buffered bike lanes one year early, in 2025, then come back and add the concrete separation with federal funding one year later.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<h2>2026<\/h2>\n<p><strong>NE Sandy Blvd: 14th to 27th<\/strong><\/p>\n<figure class=\"wp-container-4 wp-block-gallery-3 wp-block-gallery has-nested-images columns-default is-cropped\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.13-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"355\" data-id=\"368359\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.13-AM-1200x355.jpg\" alt=\"\" class=\"wp-image-368359\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.13-AM-1200x355.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.13-AM-320x95.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.13-AM-1536x454.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.13-AM-2048x606.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-12.48.48-PM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1224\" height=\"658\" data-id=\"368363\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-12.48.48-PM.jpg\" alt=\"\" class=\"wp-image-368363\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-12.48.48-PM.jpg 1224w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-12.48.48-PM-320x172.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-12.48.48-PM-1200x645.jpg 1200w\" sizes=\"(max-width: 1224px) 100vw, 1224px\"\/><\/a><\/figure><figcaption class=\"blocks-gallery-caption\">Two options for Sandy (click to view)<\/figcaption><\/figure>\n<p>This would be huge! Wagner said it\u2019s good this isn\u2019t slated until 2026 because it would require a lot of planning and juggling of various needs given Sandy\u2019s importance for so many people. He also said it\u2019s an opportunity to extend this to the west to connect with the new bus\/bike only lanes on NE 12th and Couch and then east to the 20s Bikeway. One option is to repurpose existing lanes and add parking-protected bike lanes in both directions. Or to remove one side of parking and add a center turn lane.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>SW 2nd Ave: Columbia St to Alder St <\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.48-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"355\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.48-AM-1200x355.jpg\" alt=\"\" class=\"wp-image-368360\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.48-AM-1200x355.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.48-AM-320x95.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.48-AM-1536x454.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-10.41.48-AM-2048x606.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>This project would give PBOT the opportunity to extend the existing west side parking-protected bike lane south from Alder to Columbia.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>SE Morrison St: Grand Ave to 13th Ave<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.02.01-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"393\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.02.01-AM-1200x393.jpg\" alt=\"\" class=\"wp-image-368361\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.02.01-AM-1200x393.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.02.01-AM-320x105.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.02.01-AM-1536x503.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.02.01-AM-2048x671.jpg 2048w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>Wagner is hopeful this project would give PBOT the chance to fulfill the recommendation from the Central City motion plan and further reduce driving space while making an even better bus and bike lane.<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<p><strong>SE Milwaukie Ave: Bush St to Powell Blvd<\/strong><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><a href=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.10.24-AM.jpg\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" loading=\"lazy\" width=\"1200\" height=\"369\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.10.24-AM-1200x369.jpg\" alt=\"\" class=\"wp-image-368362\" srcset=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.10.24-AM-1200x369.jpg 1200w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.10.24-AM-320x98.jpg 320w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.10.24-AM-1536x472.jpg 1536w, https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/12\/Screen-Shot-2022-12-14-at-11.10.24-AM.jpg 1946w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"\/><\/a><\/figure>\n<\/div>\n<p>This project gives PBOT a chance to make major changes to Milwaukie right through the heart of the Brooklyn neighborhood. To create bike lanes, the on-street parking would need to be removed in some sections. The cross-section varies widely on this stretch of Milwaukie so Wagner didn\u2019t share any design concepts. He did say however, \u201cI think this is such an important street to the Brooklyn neighborhood and I think there\u2019s lots of different ideas people have about what they want that street to look and feel like. I think some people would really want curb extensions rather than bike lanes, for example. Or more trees, things like that. So it\u2019s something that we\u2019d have to have a lot of community conversations about but we have a lot of time for this one.\u201d<\/p>\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<h2>Next Steps<\/h2>\n<p>From here, Wagner and his team will try to whittle down the paving project list and focus on the ones with the most potential. PBOT will also try to get a pot of set-aside funding through the Fixing Our Streets (gas tax) program to create the new Paving Leverage Program. This will allow staff to put together a multi-year schedule to plan and develop projects and create a work program going forward.<\/p>\n<p>If you have feedback on these projects or questions for Wagner, he can be reached via email at <a href=\"https:\/\/bikeportland.org\/2022\/12\/14\/mailto:zef.wagner@portlandoregon.gov\" target=\"_blank\" rel=\"noopener\">zef.wagner@portlandoregon.gov<\/a><\/p>\n<div class=\"saboxplugin-wrap\" itemtype=\"http:\/\/schema.org\/Person\" itemscope=\"\" itemprop=\"author\">\n<div class=\"saboxplugin-tab\">\n<div class=\"saboxplugin-gravatar\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/bikeportland.org\/wp-content\/uploads\/2022\/11\/Subject-9.png\" width=\"100\" height=\"100\" alt=\"\" itemprop=\"image\"\/><\/div>\n<div class=\"saboxplugin-desc\">\n<div itemprop=\"description\">\n<p>If you have questions or feedback about this site or my work, feel free to contact me at <a href=\"https:\/\/twitter.com\/jonathan_maus\" target=\"_blank\" rel=\"noopener\">@jonathan_maus<\/a> on Twitter, via email at maus.jonathan@gmail.com, or phone\/text at 503-706-8804. Also, if you read and appreciate this site, please <a href=\"https:\/\/bikeportland.org\/support\" target=\"_blank\" rel=\"noopener\">become a supporter<\/a>.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><script async src=\"\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><br \/>\n<br \/><a href=\"https:\/\/bikeportland.org\/2022\/12\/14\/clean-slate-new-pbot-program-will-leverage-paving-projects-to-redesign-streets-368345\" target=\"_blank\" rel=\"noopener\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 2017 paving project on SW Main was a precursor to what might become an influential new program at PBOT. (Photo: Jonathan Maus\/BikePortland) \u201cIn the old days, paving projects were just paving projects and it was very hard to do any of these enhancements.\u201d \u2013 Zef Wagner, PBOT A significant evolution in how the Portland [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":929,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"_links":{"self":[{"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/posts\/928"}],"collection":[{"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/comments?post=928"}],"version-history":[{"count":0,"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/posts\/928\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/media\/929"}],"wp:attachment":[{"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/media?parent=928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/categories?post=928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/basketball.runfyers.com\/index.php\/wp-json\/wp\/v2\/tags?post=928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}